this is what it will look like someday:
in the summer of 2022 we dug a big hole:
then we made the walls of the basement using insulated concrete forms:
in the spring and early summer of 2023 we poured the basement floor and started framing the sills, rims, and beams of the first floor:
in august of 2023 we finished the subfloor:
with a tarp on top to protect from the rain it looks has a nice glowy blue thing going on inside:
in may of 2024 Rockport Post and Beam arrived with these big hemlock posts and beams and put them together using their big boom truck:
then they added the structural isulated panels around the outside:
they also added panels for the ceiling. here's what it looks like from up in the loft:
in june 2024 we installed windows and in july we built steps down to the basement:
as of september 2024 it looks like a house from the outside. hoping to move in by january.
as of november 2024 we have achieved indoor plumbing: